Every question an Idaho ADU builder needs answered. What did I miss?
This page is only useful if it's right. If you find a mistake, tell me and I'll fix it.
I sat down this week and wrote out every question an Idaho ADU builder actually needs answered before they spend a dollar. Not the questions a city handout answers. The questions you ask yourself at the kitchen table, in order.
Four buckets, and the questions under each one:
Am I even allowed to build one?
- Is my property in a city over 10,000 people, covered by Idaho's new ADU law, or a small town or unincorporated county running its own rules?
- Does my city allow an ADU by right, or does it require a discretionary hearing with no guarantee?
- If my city's code hasn't caught up to the new state law yet, can I act on the state law today anyway?
- If my city is right at the population line, which count actually controls: the decennial census, or a more recent estimate?
What can I actually build?
- What's the max size, in square feet or as a percentage of my main house?
- Is there a bedroom limit?
- How many ADUs am I allowed per lot?
- Does my city allow a brand-new detached ADU, or only a conversion of existing space like a garage, attic, or basement?
- Does the ADU or the main house have to be owner-occupied?
- Can I rent it short-term, or only long-term?
- What are the setback, height, and parking rules for my zone?
- Are there timing restrictions, like a waiting period after my home's certificate of occupancy, or a rule tied to how built-out my subdivision is?
- Is there a deed restriction that keeps me from ever selling the ADU separately?
What does it cost, and how long does it take?
- What's the permit fee, and how long does review actually take?
- Can an ADU share my existing water and sewer connection, or does it need its own separate hookup fee?
- Does my existing electrical service have spare capacity, or does it need an upgrade?
- If I'm not on city service, is septic capacity actually checked before the building permit is issued, and does my lot even have a spare allotment?
- If I use one of the free pre-approved plans, how much site-specific engineering is still left to do before I can actually permit it?
- Start to finish, how long does a permit-to-occupancy timeline realistically run?
How do I pay for it, and what happens to my existing home?
- What financing actually works for this: cash, HELOC, construction loan, something Idaho-specific?
- Does adding an ADU trigger a property tax reassessment?
- Does it change my homeowner's insurance?
- Are there pre-approved free plans, or does it have to be custom?
That's about twenty-five questions. I don't have a clean answer to all of them yet. Some I do, mostly the zoning ones. Some I'm actively chasing. I emailed Post Falls this week about the utility hookup question. Some I haven't touched at all: financing, tax, insurance.
Now the actual ask. If you've built an ADU in Idaho, or you're trying to right now, what question is missing from this list? What did I not think to ask? Send it through the contact form on the homepage, or just email me. I'll add it to the list and go find the answer.